Building Futures Together Building Futures Together

Filter by Project Class

Page 1 of 3123
Featured Projects

  • IMGP2886

    Fas Gas / Tim Horton’s

    Project Class:      

    This design build service station retail outlet includes site work, a convenience store base building, petroleum system installation, canopy, and tenant improvements on a Tim Horton’s restaurant, complete with drive thru.

  • Tim Horton’s Creston

    Project Class:    

    This project was a slightly larger Tim Horton’s than we typically build for TDL Group. The building is approximately 2,700 square feet, compared to the typical 2,500 square feet.  This was a slab on grade, wood frame building with full restaurant and drive-thru capability.

  • 100_3649

    Marine Drive Husky

    Project Class:      

    This project required the demolition of the existing gas station, and removal and replacement of two gas storage tanks before construction of the three pump island, 2,500 square foot convenience store and touchless car wash could proceed.  The exterior of this building is finished with aluminum composite panels, along with brick and stucco.

  • At completion (dec 2,10)

    Langley Husky

    Project Class:        

    This 3-in-One project consists of a 2,500 square foot Convenience Store and a 1,200 square foot Tunnel Car Wash using steel and wood construction with a brick, stucco and metal clad exterior.  The gas bar includes a three pump island with canopy and two underground fuel storage tanks.  The project is completed with concrete retaining [...]

  • Chehalis

    Chehalis Convenience Store

    Project Class:    

    Cormode & Dickson was the general contractor for the construction of a new convenience store, associated with the existing gas bar in Agassiz, BC.  This is a 2,400 square foot wood structure on a slab on grade finished with cedar siding and metal roofing. It provides the community a much needed service in a building [...]