Featured Projects

  • IMGP2886

    Fas Gas / Tim Horton’s

    Project Class:      

    This design build service station retail outlet includes site work, a convenience store base building, petroleum system installation, canopy, and tenant improvements on a Tim Horton’s restaurant, complete with drive thru.

  • Running Track

    Grimshaw Multi-Plex Facility

    Project Class:        

    This facility features a large field-house boasting 3 full size basketball courts, regulation indoor soccer field and running track suspended above the field house.  The full NHL hockey rink is serviced by 8 large locker rooms, 2 referee rooms, a Zamboni room, and a seating area for 1,000 spectators.   The naturally lit second floor [...]

  • Areal view of site

    7-11 Langford

    Project Class:      

    The 3,000 square foot retail convenience store was constructed with structural walls and roof panels, exterior stone, hardie siding and cedar shake wall finishes.  FRP and paint was used for the interior wall finishes, and the floors were completed with porcelain tile.  The gas bar is a single canopy, 3 island retail facility with underground [...]

  • SAEC Northeast

    Southern Alberta Eye Center

    Project Class:    

    This project is a 4,198 square meter 3-storey office/medical building complete with a one level parkade below grade.  It consists of concrete foundation and core walls, a steel structure, concrete floor topping and wind bearing exterior steel stud envelope.  It is finished with steel and composite siding.

  • Tim Horton’s Creston

    Project Class:    

    This project was a slightly larger Tim Horton’s than we typically build for TDL Group. The building is approximately 2,700 square feet, compared to the typical 2,500 square feet.  This was a slab on grade, wood frame building with full restaurant and drive-thru capability.