Building Futures Together Building Futures Together

Filter by Project Class

Page 5 of 16« First...3456710...Last »
Featured Projects

  • Grace Lutheran Church 06-721 b

    Grace Lutheran Church

    Project Class:  

    The Grace Lutheran Church is a large wood frame structure with brick exterior and multiple roof areas, which required a creative approach to bring them all together in one main building.  Construction posed many challenges as the main church sanctuary facilities had to remain open during a very wet construction season.  It contains a full [...]

  • LDS Devon 06-942

    Devon LDS Church

    Project Class:  

    This project included a new addition and renovations to the existing chapel, as well as additional car parking area and complete landscaping.

  • 08-654 Kelowna Airport Storage Bldg 2

    Kelowna Airport Vehicle Storage Facility

    Project Class:      

    This design build storage facility building under taken for the City of Kelowna, features a carbon extraction system, six wireless remote control overhead doors measuring 24′ wide x 16′ high.  The insulation is an internal metal liner panel.  This new building is used to house the Kelowna International Airport runway maintenance fleet and measures 8,500 [...]

  • Surrey Esso web

    Esso Gas Bar/ Tim Horton’s Surrey

    Project Class:    

    This 3,200 square foot gas bar consists of a 6 island canopy and an in-line Tim Horton’s complete with drive-thru.  The project included the demolition of an existing Esso gas bar prior to the start of new construction, including environmental remediation of the site.

  • Chehalis

    Chehalis Convenience Store

    Project Class:    

    Cormode & Dickson was the general contractor for the construction of a new convenience store, associated with the existing gas bar in Agassiz, BC.  This is a 2,400 square foot wood structure on a slab on grade finished with cedar siding and metal roofing. It provides the community a much needed service in a building [...]