Featured Projects

You are viewing: All Featured Projects

  • Tim Horton’s Creston

    Project Class:    

    This project was a slightly larger Tim Horton’s than we typically build for TDL Group. The building is approximately 2,700 square feet, compared to the typical 2,500 square feet.  This was a slab on grade, wood frame building with full restaurant and drive-thru capability.

  • 100_3649

    Marine Drive Husky

    Project Class:      

    This project required the demolition of the existing gas station, and removal and replacement of two gas storage tanks before construction of the three pump island, 2,500 square foot convenience store and touchless car wash could proceed.  The exterior of this building is finished with aluminum composite panels, along with brick and stucco.

  • At completion (dec 2,10)

    Langley Husky

    Project Class:        

    This 3-in-One project consists of a 2,500 square foot Convenience Store and a 1,200 square foot Tunnel Car Wash using steel and wood construction with a brick, stucco and metal clad exterior.  The gas bar includes a three pump island with canopy and two underground fuel storage tanks.  The project is completed with concrete retaining [...]

  • Red Arrow 08-752-1

    Red Arrow Express Bus Terminal

    Project Class:    

    This 1,200 square foot modular building built on screw piles serves as a bus terminal for Red Arrow Express.  It was a fast track construction project consisting of a spacious passenger seating area, office in the back and two washroom facilities.  The exterior package includes steel cladding, aluminum storefront windows and cultured stone finishes, as [...]

  • 09-011 Lindenwood Husky

    Lindenwood Husky Winnipeg

    Project Class:  

    This Husky ‘A’ market gas bar includes 3 blender dispensers, a 2,500 square foot convenience store and stand-alone car wash building.  Demolition of the existing building that contained 4 service bays, car wash, convenience store and gasoline forecourt with canopy, was required prior to initiating construction of the new facility.